Live Project Updates

Construction Progress

Fairway Latitude, Colombo 05

A transparent look at the latest site milestones: overall completion, the newest photos and video from site, and aerial drone updates for Fairway Latitude.

Overall Superstructure CompletionUpdated September 2026

51%

On Site, Right Now

Updated September 2026

Latest photos

June to September 2026
Aerial view of the tower against the Colombo skyline, Fairway Latitude, September 2026
September 2026
Slab and column works on the top floor, Fairway Latitude, September 2026
September 2026
Street-side view with the tower crane, Fairway Latitude, September 2026
September 2026
Overhead view of the upper-floor works, Fairway Latitude, September 2026
September 2026
Aerial view from above the main road, Fairway Latitude, September 2026
September 2026
High aerial view of the tower beside the canal, Fairway Latitude, September 2026
September 2026
Aerial view of the tower, Fairway Latitude, August 2026
August 2026
Aerial view over the site, Fairway Latitude, August 2026
August 2026
Street-level view with the tower crane, Fairway Latitude, August 2026
August 2026
Site walk on a cast slab, Fairway Latitude, August 2026
August 2026
Street-level view of the superstructure, Fairway Latitude, July 2026
July 2026
Crew at work on the scaffold, Fairway Latitude, July 2026
July 2026
Column reinforcement on an upper floor, Fairway Latitude, July 2026
July 2026
Blockwork on a lower floor, Fairway Latitude, July 2026
July 2026
Cast slab and columns, Fairway Latitude, July 2026
July 2026
Aerial view of the site, Fairway Latitude, June 2026
June 2026
Aerial view of the tower and surrounds, Fairway Latitude, June 2026
June 2026
Slab formwork from above, Fairway Latitude, June 2026
June 2026

Earlier progress

February to May 2026
Level 08 slab works, Fairway Latitude, May 2026

Level 08 slab works

May 2026
Level 07 slab completed, Fairway Latitude, April 2026

Level 07 slab completed

April 2026
Core structure progress, Fairway Latitude, March 2026

Core structure progress

March 2026
Foundation milestone, Fairway Latitude, February 2026

Foundation milestone

February 2026

Aerial drone views, floor by floor

Aerial drone view, Level 07
Aerial drone view, Level 14
Aerial drone view, Level 21
Aerial drone view, Level 27

Key milestones

  1. Superstructure 51% complete

    September 2026
    In Progress
  2. Superstructure 48% complete

    August 2026
    Completed
  3. Blockwork under way on the lower floors

    July 2026
    Completed
  4. Upper-floor slab and column works

    June 2026
    Completed
  5. Level 08 slab works

    May 2026
    Completed
  6. Level 07 slab completed

    April 2026
    Completed
  7. Core structure progress

    March 2026
    Completed
  8. Foundation milestone

    February 2026
    Completed